katit
Well-known member
Can somebody do sanity check on my plan?
I have attached garage and I will be installing 100A subpanel. Wire will be run in a basement from main panel and then through the wall to garage.
1. I'm planning on using 3-3-3-2 NM wire with no conduit. Does it sound right? Length of run will be about 50-60 feet, main panel in opposite corner
2. With preparation for welder I will install 240v 50A outlet using 8 gauge wire.
3. Other stuff all will be on 12 gauge wire. Outlets, lights, etc.
I have attached garage and I will be installing 100A subpanel. Wire will be run in a basement from main panel and then through the wall to garage.
1. I'm planning on using 3-3-3-2 NM wire with no conduit. Does it sound right? Length of run will be about 50-60 feet, main panel in opposite corner
2. With preparation for welder I will install 240v 50A outlet using 8 gauge wire.
3. Other stuff all will be on 12 gauge wire. Outlets, lights, etc.

Bonded means you are insurable and grounded means you didn't take out the trash like you were told.