Today was a great day. The guys finished the sofit, sided the cupola, and put the windows in, the garage door guy came for the other build, and I got the Jeep running again.
Pictures of the doors will be in the other thread.
From George:
We had a good but cold day today...it was windy and bitter....and we
worked about a 3/4 day with the goal of siding the cupola, getting all
the windows in, and running the soffit vents along the eaves. The waste
pile got a bit bigger as we completely cleaned out the building,, but is
still running about 4/10ths of 1%....so we are happy about that.....
the cuopla came out beautifully and we used an old fashioned triangle
closure to allow the transoms to tilt inward on hot days when mor
eventing is required--although it seems a bit far fetched to contemplate
such a scenario today.... :-D
george