Hi Johnnie the engineers had to be brought in because when I went to add plumbing to the permit my buddy (a part time building inspector in a neighbouring city) decided to submit plans for some minor changes. We changed from 6/12 pitch to 8/12 to get a bigger loft. Even tho the original plans showed a loft and all the other things my buddy actually started arguing with the city planner over sheer walls and sheer points. At which time the city planner whom had been very nice to me up to now, even going out of his way to get me my permit ASAP, decided he wasn't going to sign off on the huge changes (roof pitch remember) and said I needed to get an engineers report on the building. All in all it cost me around 5g and set me back over a month. On the good side if ever there is an earthquake, hurricane, and tidal wave all at the same time I'm good to go...lol...
Funny thing was when I was talking with the engineer while he was doing his final inspection, I mentioned what I thought we could have got away with (some bracing and such) he said it would probably have been enough

...
As for heat I do need it just not that much...lol...
Murray yes I'm in the wack too, right by kincora golf course. stop by some time... My original plans were drawn up by my brother in law's father a retired architect. Spent most of his days designing library’s and such. He did a great job for sure.
As for heat I wired in a separate 220v circuit for a DR966 wall mount heater should work well enough

I was thinking wood burner but hell if I'm going to the city to make any more changes...lol...
I put in for my electrical rough in inspection the other day just waiting now...
Found a great drywall guy. funny thing is it's a good friend I had lost touch with years ago. contacted him to ask for advice and he ended up giving me a quote for doing the job. Boarded, taped and finished ready for paint at cheaper than any other quote I had gotten for just boarding it. He is good for it he was my best man at my first wedding...lol...
Looks like I'm going siding on the entire shop now as stucco on the front would cost more that vinyl on the whole building. I have a dude coming by tomorrow to give me a quote on siding and the rest of the outside finished. The insulation I will tackle my self (no one will even come give me a quote)
Hope to be done by end of October or early November...
Cheers Randy...