Happy New Year’s everyone. I hope you all have a very happy and prosperous 2019.
Tonight I arrived home about an hour and a half before the wife so I ran out to the shop and got a little bit done on the engine swap.
First off I got the engine separated from the pallet then bolted the transmission to the engine and torqued the converter bolts to the flex plate.
I assembled the Motech EZ motor mounts and bolted them to the engine leaving the actual mounts slightly loose for adjustability once the engine is sitting in the chassis.
Next I bolted the Motech billet A/C bracket to the engine.
Rear A/C compressor brackets.
A/C compressor installed and ready to install the stretch belt. Robbie really did his R&D as these brackets fit perfectly and align exactly with the harmonic balancer.
A/C stretch belt installed with the correct tool for the job.
Next up I figured I’d set the engine & trans into the chassis.
All in all I’m into the project about 10 hours and the engine is bolted into the chassis. I still have a little tweaking to get it aligned before tightening everything down in its final location but I feel I’m making decent progress so far.
Thanks for looking and I wish everyone a Happy New Year.