Hi everyone, I'm building my first shop and so far it has been one nightmare after another and I would be grateful from any insight on what the proper repair is for my latest disaster. It's a 36x36 and when returned home from work the contractors said they where walking on some of it 10 minuets after it left the chute. I'm waiting for the data from the concrete plant but they ordered 5500 with fiber and the weather was mid 90s and already a day that was a little more difficult to pour. I have 1500 feet of pex installed over a 6x6 mesh and 5/8 rebar around the skirt. The contractors say they can grind it down flat and skim coat and epoxy it but I have heard that can be a temporary solution which can cause more problems as time goes on. I have a few civil/structural engineer friends who say a properly laid 2-3 inch slab over this one should be fine for a garage with a 690 sq ft loft above. The range of opinions are still too wide to hone in on what the "right" course of action is. I'm just sick about it and any help or opinions would be greatly appreciated.


... easily the worst I have ever seen. 