Here's how I did mine:
Since I had to cut a "hole" in the ceiling anyway, because my ceiling is 11' 10" and the posts are 12' 1", I rigged a chain block in the trusses and lifted it into position.
Dave
Since my ceiling height is only 11' 10" and the lift stands 12' 1" it was necessary to build a tunnel up between 2 trusses to accommodate the height.
Dave
Well it took quite a while, but I finally have my hoist installed.
Bringing it home on the trailer.
Unloading it.
Setting it up.
Assembling it.
First lift today!
I'm sooooo happy!:D
Dave
When I built my 30 x 30 shop, about 1 1/2 years ago, I installed infloor radiant heat.
That was the best move I ever made. It is so sweet to have warm floors in the winter!:)
Dave
After almost 2 years my new shop is finally taking shape. Today I finished the interior wall covering.
Please excuse the mess. I've been shifting things around to make room to work on the walls.
The next step is to layout and install a hoist and then we're off to the races.:3gears:
Dave
Jim,
This is the same lift that I am planning on buying in the next couple of months!
Did you purchase the rolling jack with yours? If so how do you like it?
Dave