Recent content by ac5150

  1. A

    30 X 56 new construction in CA

    the cabinets are just standard Craftsman Professional Series The blinds are on the way, just not here yet. The bobber is a Triumph '69 TR6 motor in a '72 Tiger frame. Most parts on the bike are original Triumph parts from different years. There are a few trick one off pieces on it though. I...
  2. A

    30 X 56 new construction in CA

    Here are some more updates. I am actually finally working in the garage instead of just working on the garage. TV mounted Cabinets mounted & stereo installed Floor cabinets & beer fridge Air hose reel & tool rack Finally the mustang on the rack getting the ****** pan swapped out.
  3. A

    30 X 56 new construction in CA

    The boat is a Ski Centurion, but you are right, Sanger makes a boat with a nearly identical paint scheme The lift has an 8,000 lb capacity
  4. A

    30 X 56 new construction in CA

    the lift is finally in. the next and final step is cabinets. However, I am having a hard time deciding on what to do.
  5. A

    30 X 56 new construction in CA

    Last weekend was move in day. FINALLY. Still have to move in the quad, and the lift should be here next week, hopefully. Then I just need to decide on cabinetry. workbenches moved in. bikes are in. Lightning and boat. Mustang
  6. A

    30 X 56 new construction in CA

    more updates This is actually the first real project I did in the garage. I made my own base boards out of a single sheet of 18ga stainless steel. The first one going on. next I installed speakers in all 4 corners. it's now mostly complete. I passed final inspection today, and...
  7. A

    30 X 56 new construction in CA

    more updates. It's almost done now. Just a few minor detail type of things and it will be all done, except for moving everything in. Floor prepped for painting. Trim being painted black. Floor painted. It came out a little lighter than I wanted, but I am fine with it. I went with a color...
  8. A

    30 X 56 new construction in CA

    finally some more updates Getting some mud on the drywall. Garage doors FINALLY installed. These were a hold up for about 4 weeks. All of the garage doors have Liftmaster Jackshaft openers. One door has high lift tracks. Trim rings and lights are starting to go up. Ceiling fans are...
  9. A

    30 X 56 new construction in CA

    pics should be fixed now.
  10. A

    30 X 56 new construction in CA

    Well things never go as fast as planned, but we are still making headway. The stucco is finished and drywall is almost done. We are waiting on the garage doors which are backordered. Once those are in, then the epoxy floor, trim paint and were done. Here is the first coat of stucco (scratch...
  11. A

    30 X 56 new construction in CA

    Hopefully progress will pick up rapidly now. They wrapped the garage, getting ready for the stucco. Now we just need an inspection hopefully tomorrow, then the scratch coat will go on.
  12. A

    30 X 56 new construction in CA

    More progress updates. The windows finally came in and were installed. The stucco will begin on Monday. Next we had to remove the old slab to gain some elevation of the new slab. The approach slab was poured today. There is also a landing pad outside the main walk in door. I also...
  13. A

    30 X 56 new construction in CA

    Yes, it's just outside of Fresno, CA There are a few plugs that are on their own dedicated circuit. They are not 220 today, but they are wired for it and if I ever needed to add more, I would just have to change out the plug and breaker. Right now my compressor and lift are only 110. If I...
  14. A

    30 X 56 new construction in CA

    Well, we are making more progress. The roof is complete, and the fascia has primer on it. The walk in door is now hung. The electrical is also complete. It is all canned lighting. No fluorescent tubes here. There are 40 cans and 2 ceiling fans. There are more plugs than anyone would...
  15. A

    30 X 56 new construction in CA

    Well the garage is moving along nicely. Here are when the walls went up. (rear shot) (front shot) Then the trusses went up, then covered by radiant barrier osb. Here is a shot of the interior. The majority of the ceiling is vaulted. However approx. 20ft on the West side it will have...
Top Bottom