I don't think it's just Harbor Freight these lawsuits are starting around the retail industry. Yes you may not be fooled but it is still advertising deception like the furniture stores that have perpetual going out of business sales. Kohls is another one that everything is always on sale with...
got some warm weather and had the concrete poured on fri
Now I can start installing my craigslist doors I bought cheap
Sent from my SM-G920V using Tapatalk
<iframe width="560" height="315" src="https://www.youtube.com/embed/VKv_Q6twpYA" frameborder="0" allowfullscreen></iframe>
here is a quick time lapse of the build
It's up. Took 4 guys 2 1/2 days. Now I have to get some fill it's a little low in the corner and then the concrete. Debating on doing heated floor
Sent from my SM-G920V using Tapatalk
Yeah I can't wait. It's probably going to be a year long process to finish it out inside as I'll be doing it all myself in my limited spare time after they finish the shell and floor
Sent from my SM-G920V using Tapatalk
Looks good, I am going through similar process right now getting one built although mine is a bit more of a budget build. I wish I could do the heated floors. My buddy just had one built and did that, it's quite nice
Sent from my SM-G920V using Tapatalk
I just thought about this if anyone reading this decides to use Dutchway for a pole barn please give them my name (Arnold Hastings) ask for Richard Zimmerman, he said I would get a referral bonus for any referrals
Sent from my SM-G920V using Tapatalk
It says dry mix. The company that builds these does them a lot farther north then here. They told me they do dry pour so they can do it regardless of temp
Sent from my SM-G920V using Tapatalk
They came out today to get started and dug the holes for the posts but the county inspector refused to inspect the holes as he said they won't pass them if it's under 28 degrees. Builder had never heard of that before. Supposed to warm up wed so inspector will be back out
Sent from my SM-G920V...
I'm on that . I added 2 lean tos carports that I am going to put up myself later on for extra storage after the main building is done. The builder charged me $1300 ea for the materials 12x20 on each side.