    NMWU Vs RWU cable from main panel to outbuilding panel

    The pool and the shed will be a new install. Permits for all the electrical work will be requested and inspected with https://www.esasafe.com/ Thanks, yes, this will include specific permits and inspections of the grounding and bonding of the pool and equipment and ensure adherence to local...
  2. A

    NMWU Vs RWU cable from main panel to outbuilding panel

    Building a 20 x 16 outbuilding which will also act as a pool shed with the pool equipment outside. Pool pump (variable speed 230V, 11 amps max draw) and lighting main usage from the sub panel, it's not a workshop but would like to have enough capacity to run a 120V, 15A power tool if needs...