Recent content by BearBite

  1. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Had to break in the shop this weekend.
  2. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    As of right now probably just Sheetrock. I have thought about doing vinyl soffit ceiling and wood and extruded metal walls but probably just go with Sheetrock.
  3. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Thanks. They are cherries; mostly Bing.
  4. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    After many “Covid” delays my rollup doors are finally in. I love my full view door looking out of the shop into the backyard.
  5. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Thank you. I have been thinking about this for many years and it is definitely coming out better than expected. It will be a multiple use building. From an open air pool house/party shack to retired parents RV house (when they are in state) to regular storage/work shop.
  6. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    A few unfinished interior photos as requested.
  7. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Getting close to having the exterior complete. I have never written this but we decided to do stucco on the backside because it won’t be seen and there is less upkeep and more durability for the farm work. The only thing left on the stucco is the color coat. My biggest annoyance right now is...
  8. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Roof and siding are done finally after some weather delays.
  9. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    More siding and roof progress today.
  10. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Thanks, I’m loving it right now with the siding and the roof going on.
  11. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Some progress on the roof so far today.
  12. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    Fencing got done last week. Roofing and siding should be done this weekend. It would have been done this week but we got a good amount of rain last weekend and two nights ago.
  13. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    They are finishing the rock portion of the driveway. I’m happy with how the concrete came out.
  14. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    I just saw your question, I didn’t realize my post started a second page. The man door on the right will enter the shop and the man door on the left will enter a locked room. The locked room will also have an entry door from the inside. The roll up door next to the man doors will enter my...
  15. B

    Above 1200 Sq/FT The 40x60 Stick Build is Underway

    I have not done a floor plan layout besides in my head haha. The shop is going to be a multipurpose building. The bay closest with the roll up door on the side will feed into my backyard and will act as a pool house area. So basically the side door will just be opened up during pool days and...
Top Bottom