Recent content by BeerM3

  1. B

    Above 1200 Sq/FT The No Name Garage

    I got the Marketplace windows in the 2nd floor shed dormer wall and used the ledger board that'll eventually be for the lean-to covered portion on the south side for some temporary scaffolding. And then I had to paint the damn thing... I didn't enjoy painting prior. I still don't, but it's done.
  2. B

    Above 1200 Sq/FT The No Name Garage

    Once the local roofing company got it shingled I started on the siding. It's a combo of LP Smartside lap and board-and-batt to give it that older look and feel since it sits behind our 100+ year old house. Oh, and I scored some new, never installed Overhead Door insulated panel garage doors...
  3. B

    Above 1200 Sq/FT The No Name Garage

    When spring came around I was able to get the tarps taken off and started to frame up the gables and dormers. Got the massive ridge beam set and while I did do some of the 2x12 cathedral ceiling framing, I knew my limits and getting it roofed was the next big time sensitive priority. A local...
  4. B

    Above 1200 Sq/FT The No Name Garage

    We spent some of the winter months making the stairs to the 2nd floor. My son's friend offered to help so I didn't hesitate to hand him a sander. We used some of the extra 2x12s and salvaged wood from the old sheds. It works well with the "rustic" feel the upstairs space will eventually become.
  5. B

    Above 1200 Sq/FT The No Name Garage

    I got the first floor "dried in" by December and then covered it with tarps to fight off the rain and snow. A couple years later I found myself regretting not spending the extra $ for Advantech flooring. Before we carpeted the upstairs I had to rent a floor sander to smooth out some of the...
  6. B

    Above 1200 Sq/FT The No Name Garage

    With no forklift on hand, I had to figure out a clever way to get the 3/4" flooring sheets up to the next level. Youtube to the rescue! There were several variations of a hinged lift scattered around out there. I made one with leftovers and scrap laying around.
  7. B

    Above 1200 Sq/FT The No Name Garage

    I skipped a step! Because the garage width is 28' pushing the limits for what a 11-7/8 I-Joist can handle as a floor, I opted to stiffen everything up with a center beam. Because it's a 3-ply LVL, it wasn't hard for 2 of us to lift each one into place and then screw it all together with the...
  8. B

    Above 1200 Sq/FT The No Name Garage

    As part of my Craigslist and Marketplace scavenging to help keep costs in check, since it's now 2021 and lumber is stupid expensive due to a supply/demand problem in the housing sector, I found I-joists salvaged out of a red iron building that had only been used to span a closed in area. No...
  9. B

    Above 1200 Sq/FT The No Name Garage

    Sure, yeah, we should be done by 3 or 4 I think.
  10. B

    Above 1200 Sq/FT The No Name Garage

    You guys got this? I'm gonna go grab a beer.
  11. B

    Above 1200 Sq/FT The No Name Garage

    Time to start getting vertical with this thing. It's early October of '21 and I have a couple months to get walls up before it has to go on hold until spring. I recruited helpers when I could, but I think they caught on eventually and went to airplane mode on the weekends!
  12. B

    Above 1200 Sq/FT The No Name Garage

    Now it's starting to look like something. I should just tell everyone this will be a carport and save a whole lot of time!
  13. B

    Above 1200 Sq/FT The No Name Garage

    Dad my fingers hurt. Granted I was probably already pushing my construction abilities with the foundation walls, but I know for a fact I have no business pouring a slab bigger than 3' square! I hired pros for the next phase. Man, they made it look easy, and really good. We sloped the...
  14. B

    Above 1200 Sq/FT The No Name Garage

    After backfilling, leveling, and leveling again with a compacted 5-6" gravel layer, I had a base ready to start insulating for the slab heat. Laid in the (nasty) chicken foam, taped the seams and rolled out a layer of poly over that. Then it was time to start the rebar layout. The bars were...
  15. B

    Above 1200 Sq/FT The No Name Garage

    Walls poured, sewer stubbed, forms stripped and hauled back out of the pit, advil ingested. I started the backfill and compaction process after adding 1-1/2" foam insulation to the wall interior. I decided early on to go with radiant floor heat and creating the thermal break is a critical...