After backfilling, leveling, and leveling again with a compacted 5-6" gravel layer, I had a base ready to start insulating for the slab heat. Laid in the (nasty) chicken foam, taped the seams and rolled out a layer of poly over that. Then it was time to start the rebar layout. The bars were...