Last weekend I had an epoxy floor installed by a reputable professional contractor. This was a light gray epoxy base with a custom color flake (that took five weeks to get thanks to covid).
4/5ths of the way thru, they RAN OUT of flake. But they completed laying the base coat over 100% of the...