I'm not sure if this was already covered, but I could not see in the first 7-10 pages of the thread:
1) Do you need to leave a bit of room for expansion around the perimeter (assuming concrete slab on grade)?
2) Should one use grout or silicone around the perimeter?
3) Do the answers to 1)...