I'm not licensed in MI but the generator panel you referenced acts as a manual transfer switch. The loads that you want backed up by the generator would have to be moved to this panel.
Here is a link to the product info for the panel...
Re: electrician telling me there is a "break in" period for fluorescent bulbs?
There is a break in period for fluorescent lamps. Most lamp manufacturers will tell you to run them for 100 hours. This isn't as important with standard fixtures but when you install fixtures with dimming ballast it...