Recent content by chadwik74

  1. C

    Here she goes.....

    Filling up fast...(2 boats aren't mine) funny how many friends you get in fall when you have extra storage. Even had to kick the jeep out to the smaller shop. Insulation is stacked in the corner waiting for a summer install....then white tin. Hope to have it heated by the end of next year.
  2. C

    Here she goes.....

    It's a form for the sump! Sorry about the late reply, forgot about this place for a bit....
  3. C

    Here she goes.....

    Well Concrete prep has been the hardest job I have ever done in my life! Not too many friends around when you mention sand,rebar and in-floor. But I got it done and the winter pricing for cement came off last week.(Saved a grand by waiting) We are gearing up the lighting etc for a pour...
  4. C

    Here she goes.....

    Haha...that there is my baby....1980 CJ-7 with a new Aqualu body and fenders. Its still in the rebuild stage at this point..(a lil farther than this pic) and I am anxiously waiting for the day I can wheel again!
  5. C

    Here she goes.....

    Its a 21' EAGLE Aluminum jet boat with a 383/425hp mill.....So much fun on the rivers around here.
  6. C

    Here she goes.....

    It was fairly cheap...I'm thinking about 150 per day.
  7. C

    Here she goes.....

    Yep.....he installed them that same year in the beginning of Dec when it was snowing and blowing. The only thing I wish I did was get black doors....thought about painting the white ones, but not sure how that would hold up. Not too sure on the pitch.
  8. C

    Here she goes.....

    Floor pad and infloor heating coming soon in may.....stay tuned.(took a lil longer than I thought to save up that much coin)
  9. C

    MATT'S 40x56x12 CHEVELLE SHOP BUILD PICS

    Nice!!! Awesome build....
  10. C

    Here she goes.....

    A few more..........still no overhead doors!!
  11. C

    Here she goes.....

    Not sure on the answer for the first one....I know I'll poly the inside, but it's common up here to strap the walls as opposed to sheeting with plywood. In insulation you are meaning house wrap hey? 2nd one....I'm on 5acres of land with my place right in the middle. I do have one neighbor north...
  12. C

    Here she goes.....

    Floor is getting poured next year. With the late start and the cold coming I was talked into letting it settle till spring. Concrete with in-floor heating and a drain.
  13. C

    Here she goes.....

    Haha...thanks Doc!Don't tell me you never seen that white stuff before? I'm getting a bit choked with the contractor....long story short, fiancee's best friend's dad that was suppose to start in May just got started a few weeks ago and already had a few problem's. Show's up whenever....had all...
  14. C

    24 x 60 metal building addition 56K warning

    Nice shop and Truck!!!
  15. C

    Here she goes.....

    A few more..... Still waiting for the man door, window's and proper length of side wall metal. Once that arrive's it should be looking pretty good.