Recent content by Chip03q9

  1. C

    Lumber Prices Overnight

    Two years ago I priced out 40×40 pole building 24000 with out doors i put it off, so 2021 i decided to pull the trigger. I knew prices went up so I priced 36×36 with 12 foot overhang 39000 . Lumber prices were going down from 7.48 2×4 × 8 to 3.25 so I sign a contract metal was still high...
  2. C

    Lumber Prices Overnight

    1 1/2 conduit 15 dollars for 10 ft stick had to buy 15 it cost more then aluminum wire i ran to my pole building
  3. C

    Lumber Prices Overnight

    I put up a post yesterday about tariffs being raised mentioned by who and was taking down i apologize for that did not know that it was not allowed 🚫 on here
  4. C

    Lumber Prices Overnight

    What part of country are you from I'm in western MD 1 mile from pa and 20 miles from west Virginia lots of oak ,maple not much big pine here
  5. C

    Between 705 & 1200 SQ/FT Garage door springs

    Finally I will be able to open my garage doors springs will be installed Wednesday been waiting since August
  6. C

    Soil Grading Question

    Retaining wall needs to go then you will be able to slope away from house if not your going to have a big problem to deal with down the road .
  7. C

    Lumber Prices Overnight

    Most of your soft wood which is framing lumber comes from Canada about 40 % and then western part of country in md were i am from lots of timber being cut but it is hard woods
  8. C

    Planning a Morton 30x40 build in Massachusetts

    All about the money bank tried same thing on me I own 9 acres building was located in center of lot want 300.00 dollars to make sure wasn't building on someone else's lot rise holy hell about it the did back off and waved the fee.
  9. C

    Lumber Prices Overnight

    Will be 70 in August just got my garage up need to finish in side I put it off for 5 years 36×36 with 12 foot over hang for my camper health still good energy level not so much as 5 years ago .I would say your right about building when your younger get it built soon as you can I have...
  10. C

    Lumber Prices Overnight

    Prices for 2×4×8 6.48 in MD i sign a contract in August for a 36×36 ×14 foot walls 2 12×12 doors at that time 2×4×8 3.25 building was done in October began framing interior 2×4was 4.25 finished framing before the reach 6.48 still have lot's of work to be done everything is very...
  11. C

    Roll-up clear vinyl curtain

    Yes I was thinking about that same thing for wash bay will be doing a lift on other side of my 36×36 still in process of finishing up inside everything very expensive now metal for ceiling $$$$$$$$
  12. C

    Overhead doors .....long lead times.

    Two 12x12 doors orderd August 4 late November doors came in with no springs doors were installed so I could close building up to get framing electrical etc done still no springs have a backhoe and car in garage cannot move out side doors are to heavy to lift without springs glad I...