Recent content by country boy

  1. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Well between work and life it’s been slow but here are some pics Sent from my iPad using Tapatalk
  2. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Got 20 yards on concrete poured around the shop and the porch pad . Sent from my iPad using Tapatalk
  3. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Just a update . Shop floor is polished and sealed. Bathroom is almost done, just got to mud and paint. Got my trusses ordered for the next lean to. Porch post and frame put up. Waiting on a good day to put some concrete around 2 sides of the shop and...
  4. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Been slowly polishing the big part of the shop it's a slow process. But I want to move on to the next step the right side of the shop getting a 24x60 lean to . for Hight and dirt purposes I am going down 4 feet up next to the building pouring a concrete...
  5. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Got the sky lights up going down the side of the shop. Slowly moving along . Sent from my iPad using Tapatalk
  6. C

    My 50x72 shop, ( Rock shop)

    Haven't got a Lota work done to the shop but I did get my shop to man cave door up swings both ways. Also picked up 3 file cabinets up for $60 going to build a base and use them for tool storage. O and got my shop lights in. This is going to be bright stay tuned . Sent from my iPad using...
  7. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) We got the floor done today took 54 yards had prob 2 left to fix my spill way on my dam. Now to keep it wet and wait 30 days to polish . Sent from my iPad using Tapatalk
  8. C

    My 50x72 shop, ( Rock shop)

    Got rock moved in , floor drain and one more sink drain in. Painted the wall on the shop side. Waiting on a good day to get the concrete poured . Sent from my iPad using Tapatalk
  9. C

    My 50x72 shop, ( Rock shop)

    Got the wall done with osb the hole in the middle above the bath room is for tank less water heater and storage. Moving more rock in to get ready to pour the big part of the concrete ! Still working on The big 8 ' tall glass door in Th 3 Rd pic . It's a double swing door so mounting to...
  10. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Above the stair case ceiling will be storage from bathroom and kitchen . Sent from my iPad using Tapatalk
  11. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Got some more work done. Sent from my iPad using Tapatalk
  12. C

    concrete floor polish product

    They do support the swing machines it just takes a lot longer and for a small shop it kinda makes it easier. You could also use a walk behind machine but cost of renting that was more than i wanted to pay so i took the harder cheaper way. When i first talked to the company i was talking...
  13. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Got shower almost done , decided to go up higher with the shower block wall . Sent from my iPad using Tapatalk
  14. C

    My 50x72 shop, ( Rock shop)

    Re: My 50x72 + 20x60 shop, ( Rock shop) Been moving kinda slow but have got work done. I polished the hole man cave floor 20x 50 took a bit of time . But it turned out good for more info on that here is a link filled with pics. http://www.garagejournal.com/forum/showthread.php?t=322081 I...
  15. C

    concrete floor polish product

    Took a pic durning the day can see more of it's true color . Sent from my iPad using Tapatalk