Progress report:
8.5 days later it has firmed up a little but you can still leave a fingerprint with heavy pressure. It seems some spots are more dry and less tacky then others, but the tackiness has gone down.
Thanks Christine, I really hope that is the case. The question is how much patience i will need - Could you give a general timeline before I could park a car on it ONCE IT cures and hardens like the rest of the floor? I would guess at least a week once "I think" it has hardened. I'm going to go...
Christine,
I believe I talked to Jennifer in the morning. I was told to wait a week. I've tried to search and see what others experiences were with the tackiness drying, but many of the post/info I found were never followed up with a conclusion.
I finished the floor about 10:30pm on Friday...
final pics...
I used 14lbs of flake over 650 sq feet.
The top right section of the 3 pic shows the first section I completed.
** Lesson learned on tossing the flakes... You definately want to toss them straight up in the air OFF THE CEILING IF YOU CAN TO CREATE THE MOST UNIFORM COVERAGE...
some pics..
I had quite a bit of loose concrete that I removed creating a ton of spalling on this newer concrete. The 1st picture here shows only about 1/4 of what I ended up removing. Then I put about 2.5 coat of epoxy-coat (let dry in between each coat about 4-5hrs) only using a squeege to...
I just layed some Epoxy-coat down 2.5 days ago and I have one tacky section. After research I'm confident it was b/c of a mixture error or trying to remove all the material from tha batch (banging it on the floor removing some inactivated material). The 10x12 section is tacky throughout...