  1. F

    Potential first time larger electrical run (workshop/garage)

    You know Im about that life !
  2. F

    Potential first time larger electrical run (workshop/garage)

    hard to go on inside as have drainage tile and landscaping all by house now
  3. F

    Potential first time larger electrical run (workshop/garage)

    damn - measured it out today - 280ft......
  4. F

    Concrete finishing question on new floor build

    You did that yourself ?
  5. F

    Potential first time larger electrical run (workshop/garage)

    ok thx all. Im sure I'll have more questions in a month or so when I actually get to start ...... still working on getting permits for the shed and waiting drawings ....... I'll bury it in conduit as yes its quite rocky area where I am at on side of a hill. oh - does the romex wire in the...
  6. F

    Potential first time larger electrical run (workshop/garage)

    awesome tips spark 1971 and all - thx Any tips on pulling the wire ? I saw this as a backup plan ...... Also I think the inspection is a 2 part process - meaning I think I pull the permit ...... they come out and inspect 1 stage - then a final stage ? But cant remember what they are...
  7. F

    Potential first time larger electrical run (workshop/garage)

    Thanks 75gmck75 Good year btw - year I was born ;) Yes sorry its 2-2-2-4 AL MHF wire I will be using Ok will go with 2" conduit. The pull does have me a little worried to be honest. Is ther e NEC code around volume that is mean to be adhered to based on size of wire - or is it just a cost...
  8. F

    Potential first time larger electrical run (workshop/garage)

    Hi all Looking to build a workshop to house a 57 chevy. Washington State. Thinking of pulling permit myself. Everyone is backed up out here ..... and also tbh - like to put the extra $$ to insulation. So my plan as of right now ...... but some questions. 200ft run. Build it as 90A to match...