i built a 30x40 had 20ton of 3" rock brought in, spread it, a month later I had 20ton of 1" rock, spread it, then a moth later I had 20ton of crush and run. spread that and about 2 -3 months got ready for concrete, packed it and vapor barrier.
concrete was poured 5" with fiber mesh and wire. 8"...