I'm almost ready for a rough-in inspection. I added a 2nd main panel to feed a attached garage sub panel for 6 new circuits in the garage (lights, fans, lift, air compressor, 2 receptacle circuits).The first 200A main panel is full physically and fully loaded. So, to get enough current to run...