Recent content by GutWrench

  1. G

    Leveling a pad

    Yep it just depends on the conditions and location. I just did one. I dug out 18". it was a topsoil with sand underneath it with a lot of water in the sand. Mucked all that out filled it with lime/dirt mixture. then bult up the base level and 6" above grade with 60/40 clay. One the building was...
  2. G

    Anywhere camera security cameras

    I have reolink. onboard storage or NVR - no fees etc.
  3. G

    Improved socket sets from Tekton

    Yeah it was literally 18 days or so, lol... I’m happy tho. They are doing the job. I may give my dad these and buy the newer ones. I don’t really think it’s worth it just for the ratchets as I use Snap-On’s. Anyone put the new sockets to use yet? Notice any real difference other than cosmetics...
  4. G

    Improved socket sets from Tekton

    Hi guys, this is my first post on the forum and thought I would jump in on this thread. :) I just bought both the 3/8 and 1/4 inch drive Tekton socket sets a few weeks ago to replace my scattered older craftsman sets. I too wish I had known Tekton was going to release a revised version before I...
Top Bottom