We didn’t know it was like that until AFTER we had the garage epoxyed. We had the back of garage loaded with cabinets etc, covered with tarps while the garage was being finished. So concrete was completed as well as the epoxy. You couldn’t tell from the inside of garage that this even happened.
I recently had the concrete replaced in my garage. The cinder blocks shifted with the breaking up of the old concrete. The pic is the backside of the garage wall. Advice? Suggestions? Isn’t this something that the concrete company should pay for?