Tanks can be filled to 85%. A weak pressure relief valve can still cause the tank to pop off even if it’s filled correctly.
Sent from my iPhone using The Garage Journal mobile app
Wow, that takes up quite a bit of space. I’m doing one of those tubular vertical A frame steel buildings. The rails are 2.5” thick and from what I was told the garage doors are almost flush with the outer wall.
Can’t tell if you have roof insulation from the pic, but what are you going to use...
Just had this done today, the relief cuts were done not even 2 hours after the pour. No cracks yet.
Sent from my iPad using The Garage Journal mobile app
I have measured out two 4x8’ sections where it will be possible to put the lift. I figured 8’ would give me plenty of room to move the lift towards the front or back of the shop if necessary. 8” deep reinforced also.
Don’t think I can get away with that large of an extra slab, it would depend on cost. I’m not so sure that 4x4 will be big enough especially since I don’t know where I want the lift.
It’s what I can afford, originally it was going to be 24’. The channels for the building are going to take up roughly 3” along the edge and the roll up doors will be just about flush with the outside wall. My 2500HD is 21.5’ long, I think I’ll have enough room to do what I need to.
How far...
Good evening, I’ve been lurking for a few hours and have read some great information but I can’t seem to find what I’m looking for exactly. I am doing a 28x41x12 and want to put a lift in the shop. Bay doors will be 10x10 on the 40’ side with there being a 28’ depth. I plan on putting the first...