Still working on getting these plans scanned. I had to unload also. The driver pretty much just sits in the truck until you are done. I had a tractor with forks to unload it. The tractor will only pick up 1000 lbs. I had to break the band on the purlins and take pick up only half of the load in...
I am in the process of erecting an Olympia steel building right now. It is 30x50x12. I have all the framing done and should be on target to start sheeting next week. I went throught the same thing that you did. My inspector finally told me that I had to have foundation plans drawn up by a local...
After a year or so of every kind of delay imaginable I finally got a concrete pad poured to erect my 30 x 50 Olympia steel building on. To my delight the concrete guys did not square up the pad correctly.:FIREdevil How do I go about correcting this? The pad is a 30' x 50' monolithic pour with a...
Wow. Awesome advice so far. I will be definitely be going with the bolts in the slab now. Talking to the concrete guy he said I would have to pay a surveyor to survey the bolts to make sure they are right.:confused: Also, after talking to the inspector he said I would have to get a set of...
Hi, Long time lurker, first time poster here. I am finally getting a slab poured this weekend for a 30x50 Olympia Steel building and have a few questions.
The prints call for putting the anchor bolts in the slab but everyone around here say that it is better to drill and set them while putting...