Recent content by jason94gm

  1. J

    Pole Building Vs Stick Built (With pricing included!)

    This was the day after the floor was poured.
  2. J

    Pole Building Vs Stick Built (With pricing included!)

    I just went through this same decision and I'm also in SC (near Columbia). I ending up with a pole building from Armour Metals out of Augusta, GA and I am happy I did, for a 36x36x14 with concrete i'm into it about 25k with the inside completely unfinished except for radiant insulation. That's...
Top Bottom