Thanks all! A few clarifying points based on questions asked:
In our neighborhood the ground/soil is 3-4 feet below street level (neighborhood being built in the 1800’s; street raised 3-4 feet above ground to accommodate sewers). Existing parking pad is built on top of cinder blocks stacked 3-4...
@Matt_i, How deep would it need to be to be frost-protected? I should note that the full plan of contractor A is to demo existing concrete slab and retaining wall and install: new concrete retaining wall, new 4” of crushed stone, and new 4” of concrete slab w/ wire mesh. My main concern with...
We’ve had two contractors come out for building a new garage for us with two very different approaches. Have done a lot of research (grateful for this board and the experts here!) but can’t determine if there’s a clear-cut best option for our specific situation and would appreciate any...