What's involved in a heat load test?
I just built a 1 story 30 x 40 cabin in Northeastern Mn. stick built with 1/2 log siding, it has R-19 in the walls, R- 60 in the ceilings, half the building has 8' ceilings the other half has a vaulted ceiling, probably 11' at the highest point. Theirs 4 -...