I'm dealing with the same situation. I have a 30x40 pole building that I want to prep myself for a floor. I found a deal on some #3 rebar but not sure on the spacing. It's in the country and no codes have to be followed. I did find this calculator. http://www.blocklayer.com/rebar-slabeng.aspx