So I think I have been using the voltage drop calculator linked above wrong.
I've been using it with 120V
Because I'm actually pulling 4 wires (120V X2, a neutral, and a ground) I should actually be using 240V in the calculator correct? (I'm a newbie so be kind LOL)
Using 240V and the #2 AL...
I have read a lot on here about installing a 100 amp sub panel to power a detached garage. The reason for my, “yet another sub panel to shop” post is because of the distance from my main panel to the shop.
So my scenario is:
24’x36’x12’ metal (carport style) enclosed shop
Location: South...
Building install is done with the exception of the header seals for the roll up doors, which will be here next Tuesday.
The guys showed up Monday afternoon to unload a few things for about an hour. They started at about 8 am Tuesday and finished about 5:30 pm. They were pretty efficient to say...
Building is scheduled to be installed 3/12. With the amount of rain we have this time of year, I won’t be surprised if it gets pushed back due to delays.
Slab is done, now waiting to be scheduled for the building install. I was told 4-6 weeks by the salesman, let’s hope he is remotely correct. I have a lot of dirt work to do so that should keep me busy for some of the wait.
Slab site is ready for concrete. Removed what little top soil was there, compacted 3-4” of fill dirt, then compacted 3-5” of crushed concrete on top for the base.
12”x12” footers, rebar in footers, wire and rebar up top.
Scheduled to pour concrete Thursday 9 am.
The grass hill was super wet...
I got one of the big pieces of my shop build project done today. The area that is the "driveway" to get to my shop area is very close to our pool. With the large amount of pool decking (pavers) and a stone retention wall all the way around the pool, the last thing I wanted was more concrete...
A little back story. I've been a member of this forum for a long time. I joined shortly after I moved to my current city in 2012. I left behind a new 24x36 shop at my former house. I've been waiting to build a shop at my current place since I moved here August 1, 2012.
It is finally time. My...
Well, I signed the contract and paid the deposit on my building this afternoon.
Tubular metal building
24x36x12
12 gauge frame
5' centers
Horizontal siding
Single bubble roof insulation