I have a 1000ft2 shop that I just built, poured the slab a year ago. I put an tan epoxyshield kit with flakes over half of it. Then I covered that with Rust-Oleum 2 part clear epoxy kit with the slip resistant grit. I had too much stuff in the shop and not enough time to do the whole thing...