Lift control side is 1/2" EMT. Eight 12AWG THHN conductors. 2 hot + neutral for 120/240V lift receptacle. 2x hot + neutral for each of the 120V receptacle circuits. 1 ground.
Opposite side is 3/4" EMT. (2) 12 for 120V 20A receptacles, (3) 10 for 120/240V 30A, (2) 6 for 240V 50A, (1) 10 for ground.