One last question to MRB. Is there any reason I shouldn't go with a 100 and a 125 in the main box and then the 100 and 50 in the MLO load center just in case. I have a gas range, gas water heater, gas furnace and HE dryer in the home a probably do not come any where near to 100 amps in the...
Sounds good. I think it will work. I was just thinking, I will never be in my hot tub, have the table saw running back there and be welding or doing anything like that in my shop at the same time. So, I think this is good to go, and the easiest solution. I just priced those 150 breakers and...
Huh? I can dice 250A out of my 200A service according to the city. I have to do it right of course. I will not be doing anymore upgrades on this system or property so why do it a more expensive way? If I am following up above I can just add a 100-150 MLO load center and swap out the breakers and...
They will let me load here, the 125a are only like $38 bucks plus breakers. It only holds two. Is there anything wrong with my strategy? Here are some shop pics. I have better ones, before and after, but swithing to a new computer, I don't have my NAS hooked up yet. Here are a couple of pics. I...
What do I mean? Well good questoin. That was joke but really, wouldn't I have pull the house and backroom wires out and bring them into the "new 200a" somehow? Do I have enought length? Can I get that creative with my conduit to reroute it? Or, can I run it though the main to the new panel? I...
Thanks for all the responses. I really think this is the way to do it now. Athough putting in a new 200 would be some work if it invovles pulling out old cable and rebuilding some conduit dual cut in loop or something. I was just down at True Value inquiring (I live in the "most remote city" in...
Thanks, what is MLO? So, the MLO needs to have 2 breakers, one 150 and one 50. A special QN breaker, what is QN? Seems very doable. No way at all then of just adding a lug or tap then?
I wonder if it is more apt to accept a certified tap? By the looks of it, I am dealing with a bussbar station, if you will, rather than trying to tap an edge or something? What lies beneath the plastic shroud or cover, a one pole station or what?
LN
This is not a password related to this site or anything else I use. I just dumbed one down for this purpose on a free site I could care less about. I wonder what gets people to go off like this? I hope these links are helpful to the problem at hand.
http://gi163.photobucket.com/groups/t286/JE5VCR3DSM/Garage2--9005.jpg
First of all, don't freak out. I did not open the sealed part were the meter resides. I will try and link the photos.
http://gi163.photobucket.com/groups/t286/JE5VCR3DSM/Garage2--9007.jpg...
--------------------------------------------------------------------------------
www.photobucket.com\l_anthonywiring
password: l_anthony1
P.S. In group albums on photobucket: l_anthonywiring
Might have found something here. The diagram shows bussbar 1,2 possibly available? Under a plastic...
www.photobucket.com\l_anthonywiring
password: l_anthony1
Might have found something here. The diagram shows bussbar 1,2 possibly available? Under a plastic cover? Its hot there though with no shutoff? Please take a look.
Thanks,
LA
Well it is raining here so no picture yet unless I find one I took earlier. Anyone know were I can post a picture and create a link to? Back to electrical. What I am using for a disconnect is a Eaton Cultler-Hammer 100A BR2100BRP.