Recent content by Latitude42

  1. L

    Interior finally finished & couple projects...

    Ceiling strips were stock 12' from Menard's
  2. L

    Jack shaft opener question

    I did see a couple YouTube vids of guys converting a normal door opener to jackshaft type... looked pretty interesting. Something I might try.
  3. L

    Interior finally finished & couple projects...

    Here is a work bench I made out of scraps... & one of the 4 rolling storage carts I'll be making for tools & stuff that will go under the bench.
  4. L

    Interior finally finished & couple projects...

    The out building is finally 99% finished!!! Now I just need to organized all the "stuff" in want to cram into it.:willy_nil It is 22' wide by 44' long ( we had a 1000 sq/ft restriction so these were the best dimensions I could come up with for my use). I have 2" 250 pink poly with taped seams...
  5. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    Well, the heat is in and works great... (The pic is before I installed the condensate drain & pressure overflow pipe.) Have t-stat set at 63 deg. and that seems to be t-shirt temp. This thing is sooo silent! I only hear a click when the call for heat is hit, I hear the Takagi kick in, then just...
  6. L

    Advice Needed - 400w Metal Halide LED Reftrofit

    These look like they might work too...
  7. L

    Cheap lighting option

    I have 18 of them mounted in my shop, Great light for the $$$$$.
  8. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    I am currently heating my building with one of these little 120v oil heaters!!! It keeps it 65 deg. in side and has been costing $60/month. I think I got the insulation part right.:)
  9. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    Ok, after Much more research :confused:I think I'm going to go with the "KISS" system. I'll use the Takagi T-H3M-DV-N (it's not a "boiler I know,but I simply do not have an extra $4500 laying around to spend on one). From the Takagi I will go out to a union, then to a P/T gauge, then to a...
  10. L

    picts of your in-floor heat set ups.

    Could you please post a pic of your system?? Thanks
  11. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    Probably still a little too confused... I thought I was basing my system on these two designs. (See pics 1 & 2) Are these systems plumbed wrong? On a second note if I was to run a Primary/Secondary with the "purge T", do you run it with the "T" closed (see pic 3) or open (see Pic 4). If open...
  12. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    Also, is the 1/25 hp pump I have going to be enough with just one pump, should I go to a 1/6 hp?
  13. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    ok, so heater, then water make up, then air separate, then pump to supply manifold through pex loops, back to return manifolds, then back to heater? eliminate the Purge "T" and the pump before the heater. Where should I put the LWCO? Thanks!!!:)
  14. L

    Out Building Finished, now for the hydronic heat... please critique proposed setup

    Yes, A DIY... new to hydronic...not sure on the outdoor reset. still checking. Pump on secondary loop.... Have seen them with and without, but it seems like I might only need one pump?
Top Bottom