Got some stuff done so ill toss a few pics up. Ceiling is done with 1200sqft of r38 unfaced up top, electric is done for now, inside lights installed 6 lamp t8's, lift installed and operating bendpak 10k symmetric, compressor installed wired and plumbed just waiting on my dessicant filters...