Here is my method, I'll call it method 3, no staples, or tie wraps, steel goes on top of the pipe and it's safe to cut, no risk of the pipe floating. The foam also incorporates a vapour barrier on the tubing side, and its interlocking so once its set in place it cant move apart. all in all this...