I guess I never saw the post from PKIM so long ago.
I plan to eventually do some closed cell spray foam insulation. It would have definitely been better to do it before I filled the building with stuff, but I didn't have the extra $6k-$10k to get it done. Lumber was $2700 locally. If I had any...
I haven't been updating here as I had planned. The actual construction was non-stop for a couple weeks of vacation from work but slowed down once I had to return to the real world. All of the structural stuff is totally done, I installed a basic subpanel from the house to run a couple outlets...
Thanks, it has been a long time coming and the finished product has everything to do with the help of a great contractor who has been steering me in the right direction.
That something that will be in the "phase 2" of this build. For now, I am just doing the bare minimum required to be able to...
I am a long time lurker of this forum and this is my first post. Also, to be fair, my house is only about 700sqft.
The story begins in the summer of 2015. I was ready to buy my first home and was disappointed with the fact that I couldn't find anything with a decent garage for what I was...