Recent content by mcmuria

  1. M

    Lighting a shop with no climate control

    Thanks to all for the input. I am a retired carpenter and found this forum while looking for advise on running the service into my garage. After combining the input from several members I went to work. The inspection that was made when I upgraded my incoming power to the property went off...
  2. M

    Got called a hack today on a job by a sub contractor, who's wrong?

    To strive for perfection and reach average is better than striving for average and become mediocre
  3. M

    Lighting a shop with no climate control

    My garage is a 25 by 30 steel building with 10ft sidewall and open ceiling (12ft ridge) . No heat no insulation for now. Temp. range from -20 to +100. I want to put in lighting that will work under these conditions. I have a 100 amp service and running EMC thru out. The work shop area (10 by...
  4. M

    Question about feeding a sub panel

    I recently upgraded the electrical service at my home. My electric co-op replaced the existing 100 amp feed with a 200 amp supply. The upgrade included new wire from the transformer to the power pole pole. I have 100 amps going into my house. (approx. 25 feet from the pole) I am putting a 100...
  5. M

    new member from southern Iowa

    Greetings to all members. I am a retired journeyman carpenter. I have just recently put up a 25x30 all steel garage. I have a lot of questions and I am looking forward to accessing the vast knowledge base of the members of this forum. Thank you in advance. mcmuria