    New building

    We are having insulation blown in the attic floor.
  2. M

    New building

    Its been slow due to all the rain we have gotten but the concrete was poured and sealed Friday, cut Saturday and the approach was poured Monday. Spray foam started today and they will finish tomorrow. Friday the doors will be up. I will hang the lights and breaker panel Saturday. Next week the...
  3. M

    New building

    Monday they finished the outside and I was able to run wires for the lights and door openers. Tuesday morning they finished with the ceiling. It took about 20 hours total. The crew that built it was great, like a well oiled machine. Very impressed.
  4. M

    New building

    More progress!
  5. M

    New building

    Today was demo day and tomorrow they will prep the base. Thursday is the scheduled start day. There was some pretty thick concrete, some of it 20"+ and a 4x4x4' concrete antenna tower base that was covered with dirt behind the old garage that was a suprise.
  6. M

    New building

    We have 1' vented overhangs on the eaves, I will check the cost for 2' gable and eaves to see where we would be at. Thank you.
  7. M

    New building

    Now that we are getting close to demo and the start of the new building, we have decided to go with a 36x64x14 building with 5 windows (two on the sides and one on the back wall. We are going with two 12x12 insulated doors with a row of windows in each door. I took some photos of the current...
  8. M

    New building

    Since we are getting closer to this being a reality I wanted to get some input. At this time we have a quote for a 30x56x14 building. 30' was about as wide as we could go, I might be able to fit another foot or 2' in width and I could add to the length, but want to keep the cost reasonable...
  9. M

    New from north central Indiana

    Hello, I have been visiting and searching threads here recently as we get estimates. We are building a 30x56x14 post frame for storage and hobbies. It will be insulated and heated. Looking forward to learning more as we prepare and plan.