Control joints were sawed less than 24 hours after the concrete was poured. Which are 3/4" deep by 5/32" wide. Sawed every 10-15'.
There is a vapor barrier under the slab (6 mil). The digouts for the lift are 2 15x15x12" (or round about). Nothing was put on top of the concrete after
Rebar is...
I had my concrete pad poured just over a week ago.
Here are the specs:
30x40
4" minimal depth (it's way deeper than in most sections)
16" footers with continuous rebar
12" deep where the lift is planned to be installed
3600 PSI fiber reinforced concrete
While stopping by and watching the guys...
I've been stalking this build for quite some time. Really into the 2 tone walls, my only change if I decide to do a simular build it is to opt out of the fluorescent lights, they still to this date bother my eyes :/.
Can't wait to see some cars in there!