Well I let it go 48 hours and it passed. I was nervous because I do not have a vapor barrier. I also have a high water table. About a week after I poured the floor I put a piece of OSB in the corner to put my lawn mower on just in case it leaked oil, I didn't want it to stain the new floor. I...
I am getting ready epoxy paint my new concrete floor. I saw some posts about doing a moisture test. I duct taped down a 6 mil garbage bag, about 2'x2'. How long should I let it go before checking? The floor is 2 1/2 months old.
Thanks, Jim
Where did you buy the Professional version. My local HomeDepot has the water based version and the guy in the paint section said he couldn't get the proffesional. I looked at Lowes online and they sell the Proffesional version, but I can't get it at my three local stores. :mad: