Getting ready for the slab pour! 6-7” thick. Rebar every 2’. 3500ksi. Phx az. Buddy that used to be a builder is telling me I don’t “need” control joints, and I would prefer to not. What do you experts think? I would need to exclude in the area of the future 2 post lift at a minimum. Thanks!