More Updates.
Painted the walls, covered the ceiling in metal, and upgraded the T12 fixtures to LED.
It's just about done and ready to do fun stuff instead of working on it.
Had a few friends stop by last night and we finished the walls in OSB. I plan to finish screwing them today and hope to get primer or paint on the walls this week. I'll post pics later today or tomorrow.
A few more details that I left out.
Initial plans is to make two "bays" with the garage doors and install a 12K lift on the left hand side. Without doing much research, we placed 2 6’x6’ pads that are 6" thick and the rest of the floor is 4”