In general what are the wait times to receive service or start the construction process.
My area to choose a contractor would be in the Southern Illinois, Southern Indiana, or Western Kentucky locations.
It seems most are very busy and wait times are long even for detailed estimates. Most...
I dont see the cooler being moved. My concerns would be the cooler floor absorbing heat from the parts outside the cooler. I want more efficiency in the building than in the cooler
If I put radiant heat in a 70 x 50 slab but in the area close to the center of the slab will be a 34 x 14 walk in cooler. The cooler floor will be the slab floor. The cooler will be a studded out rectangle and well insulated. it will also have cooling equipment that would be over kill. The...
Hi
New member and enjoy looking around the forum. Pictures of the garages are fantastic.
I would like some opinions, if possible, on cost of building. This would be for a retail sales outlet for a mom and pop type store. I was shocked with the first quote I received. I have some knowledge of...