Well we managed to finish moving in before I had to turn in my keys to the old shop on July 1st. The place is an absolute and utter disaster right now (you REALLY don't know how much stuff you have until you have to move it). Yesterday we finished the mezzanine and putting the floor down on...
We started moving stuff and we brought my car over finally. To give a sense of scale she's about 21 feet long.
Then of course we had to break out the drift trike :)
https://photos.app.goo.gl/MpDyeAdfbdx3aayS8
Honestly it's pretty much what you see with a lot more wiring and random ****. We have a bunch of banners, some neon, and random pieces of randomness we might hang on the walls (and my soapbox car from the ceiling) but that's pretty much it. The 'machine shop' area under the mezzanine will get...
LET THERE BE LIGHT!
When looking at different lighting solutions we saw quite a few that we thought would be good but most of them involved some kind of 2nd mortgage to afford. Saw some absolutely incredible LED panels that were about $220 each but we'd need probably 15 of them and honestly...
I only did the 1/2 for the 14g wire for the lights for that exact reason. One of my shop mates (who does commercial HVAC for a living) loaned me his 1/2 and 3/4 benders. Pretty much everywhere else in the shop is getting 3/4" and we're likely going to run the 1" conduit (with bought bends...
We have power!
After doing some reading about the lights I bought we decided to just wire them all on the same circuit and daisy chain 3 together per rafter set. The 5 lights that are up right now are pulling almost 2.9A total so the 15A circuit is enough to handle all 15 lights. Pulling...
Spent the day on Sunday trying to clean the dirt off the floors but my pressure washer broke (chemical injector fitting split and caused water to fountain out of it). Ended up just using the prodigious water pressure, a spray nozzle, and a lot of squeegee work to get about of half of the shop...
Looks good!
I think that 25' is a very long span for a single span purlin and generally you'd want an 8" or 10" purlin for that. As far as roof pitch you'll probably end up at a 1:12 or 2:12 pitch when talking to the engineer and they'll have to calculate various load ratings. I would...
The mezzanine was upgraded from 40 to 50 psf. We're going to be using 3/4" T&G OSB for the flooring. Considering I need about 28 sheets of it it might be a bit before I go buy enough to put up.
Spent the day today doing more landscaping along the driveway. We should be scheduled for the inspection tomorrow!
Also I’m happy to say that after 8 days I’m starting to see some grass sprouting up but only exactly where the power company will be running wire in the next few days.
One of those funny little tidbits you pick up at some random point. The term 'mandoor' was actually a Dutch word for basically a foreman for slaves. In more modern parlance a 'man door' sometimes specifically means a door cut into a bigger garage style door. A door entering a garage space or...