in mine the slides were evenly spaced top to bottom and the deeper drawers had 2 slide on them. I hit the releases and pulled out the top 2 and the top deep and then swapped locations took maybe 5 minutes and no tools
How did you pipe to the table saw? I got lucky in my new shop and got 4" PVC and 1-1/4" conduit under the floor before it was poured. Haven't gotten the dust collector hooked up but I'm getting closer to that point.
Williams has you covered
http://www.jhwilliamstoolgroup.com/Cat-21-1-193/Open_End.htm
and the handles
http://www.jhwilliamstoolgroup.com/Cat-21-1-192/Handles.htm
this with whatever handle length you need
http://cgi.ebay.com/NEW-WILLIAMS-TOOLS-BIG-BOX-END-WRENCH-1-7-16-36MM-/280429478851?pt=LH_DefaultDomain_0&hash=item414ae643c3