I was going to use it as a fill in side. I have run rebar between all post horizonally. Drilled two holes (evenly spaced) a drove the rebar thru posts, dug two holes 2' down between posts. Formed posts on both sides and rear, mixed concrete and poured concrete between posts. Its about 4"-5"...