My garage just passed the final inspection :beer:
I would like to thank all the folks who answered my electrical questions and the other people who answered other posts that also helped me out.
What a great forum.
My 24X40 detached wood framed pole garage is now near complete, I am in Kenmore Washington and my city uses the state of Washington for the electrical inspections. I will be using a 200amp overhead service entrance into a new meter installed on the garage. Washington State follows the 2014...
Hi Igor...So far I have no water in my completed garage. I too installed a interior drain pipe on the inside of the potential leaky wall and over that I placed 20mil vapor barrier and then poured the slab.
Hello CNGsaves>>
There is about a 4"-5" drop from the perforated pipe down to the solid downspout pipe, we have not had any heavy rainfall latley and the water is not backing up into the perforated pipe.
Thank you.
Hello Moto
I do have the perferated pipe conected to solid 4" pipe draining away from the garage. The perferated pipe is higher than the solid pipes, so water from the downspout is not going into the retaining wall perferated pipe.
Thanks
Hello Folks>>
“Long time listener, 1st time caller”.
I am having my dream built in the form of a 24X40 post garage in Seattle. The posts are in as well as the roof and most of the external walls are finished. On one 40’ side there is a 3 ½ foot tall X 6” wide retaining wall going the full 40...