This is my workshop. Not planning to finish the walls but I’m building a barndo next and these ideas will come in handy.
That’s the plan. 3/4 plywood directly into the purlins and hand the air handler on that.
Sounds like I was an over thinking it.
Just mount the plywood between the purlins and then mount the air handler to the plywood and call it done. I don’t need the unistrut is what I think you are saying.
Good day everyone.
I have a steel building and trying to figure out the best way to hang my split system air handler. It’s 17lbs so not so much weight.
I have horizontal Cee purlins in my building. If you look at the picture attached I wanted to hang the air handler right at the lower purlin...