  1. S

    Concrete drying time

    28 days is the norm
  2. S

    Filling Control Joints

    Mine already have a V notch (they were NOT saw cut) ALSO FWIW slab is post-tension Will
  3. S

    Filling Control Joints

    I am going to test the moisture content of the concrete before putting down the coat Will
  4. S

    Filling Control Joints

    I just had delivered The epoxycoat kits (Premium kits with UV 1.5kits) and was planning on filling my control joints (sikaflex sl and backer rod) The slab is brand new (it's 5 months old) but has not had a single vehicle, etc on it. It is lightly raked. My question is do i fill the control...